Tendering
THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : Nov 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Le nouveau Directeur de l’AFD, Christian YOKA, reçu par le Ministre des Travaux publics
Posté le : May 26, 2016, Par : admin - Dans : Actualités
C’est dans le cadre d’une audience accordée le 19 mai 2016 par le Ministre des Travaux publics au...
Autoroute Yaoundé-Douala : Le profil de l’infrastructure est connu !
Posté le : Oct 28, 2014, Par : Hannah - Dans : Actualités
Le profil définitif de l’autoroute Yaoundé-Douala serade 2 fois...
Entretien de la N1, Garoua-Maroua, un contrat de gestion par niveau de service en cours
Posté le : Jul 6, 2021, Par : alima - Dans : Actualités
Autoroute Yaoundé-Douala, Phase I: un Protocole d’accord signé par les acteurs
Posté le : Apr 14, 2022, Par : alima - Dans : Actualités
Plan de relance du MATGENIE : le MINTP tire les premières conclusions
Posté le : Sep 15, 2022, Par : alima - Dans : Actualités