Appels d'Offres
Installation of Gantries on the Mora-Dabanga-Kousseri Road
Posté le : nov. 28, 2022, Par : alima - Dans : Actualités
The installation of gantries on National No.1, Mora-Dabanga-Kousseri section, has recorded progress as one has been erected at KP 4+500 between Mora and Kousseri. It should be mentioned that so far, it takes up to 6 days to install a gantry. Two prefabricated gantries are fit for installation, the third one is being assembled at the workshop.
The Minister of Public Works has decided to install these devices, including rain gates, as a result of non-compliance of road users with the regulation governing load limits; they rather abusively overload, as observed on this section of National Road No 1. This conduct impedes works which have been going on for several months now, and has led to the advanced degradation of the pavement.
Plus de contenus dans Actualités
Bitumage de la route Akonolinga-Carrefour Yil, la pénurie de carburant perturbe les travaux
Posté le : avril 28, 2023, Par : BEYOKOL - Dans : Actualités
Route NkolessongNding. Les travaux de bitumage s’étendent à la ville de Nanga Eboko.
Posté le : févr. 19, 2018, Par : Eliane - Dans : Actualités
Les travaux de construction de la route Nkole...
Voies de raccordement de l’autoroute. L’entreprise exécute des travaux
Posté le : déc. 9, 2021, Par : alima - Dans : Actualités
Unité d’émulsion du bitume : le MINTP explore les offres des promoteurs
Posté le : nov. 21, 2023, Par : BEYOKOL - Dans : Actualités
CONSTRUCTION ET ENTRETIEN ROUTIERS DANS LA REGION DE L’EST : LE MINISTRE DES TRAVAUX PUBLICS FAIT LE POINT
Posté le : nov. 21, 2018, Par : admin - Dans : Actualités
A l’aube du septennat des Grandes Opportunités et dans la perspective du programme de construction et dâ...