THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
LE LABOGENIE OUVRE SES PORTES
Posté le : avril 9, 2014, Par : Hannah - Dans : Actualités
Sous le haut patronage du Ministre des Travaux publics, le Laboratoire National du ...
Travaux de construction de la route Esse-Soa : les travaux s’étendent au PK 19
Posté le : juin 24, 2020, Par : alima - Dans : Actualités
Projet de développement du secteur des Transports, un Master pour optimiser la planification
Posté le : févr. 22, 2022, Par : alima - Dans : Actualités
Traitement de la chaussée sur la section Ngaoundéré- Garoua : 73,56% des travaux réalisés sur le lot zone Aéroport-Dang.
Posté le : juil. 6, 2022, Par : alima - Dans : Actualités
131st International Labour Day festival 2017
Posté le : mai 3, 2017, Par : Hannah - Dans : Actualités
MINTP meet up with the enthusiasm of colourful and unique fabrics, an indication of peaceful and intimacy ...