Français English
Vous êtes ici : Projets/Réalisations » Actualités » Journal des projets

Journal des projets

Maintenance of rural roads to exceed expectation in SW

Posté le : août 31, 2016, Par : ngono - Dans : Actualités

The launching of National Tender by the Minister of Public Works, Emmanuel Nganou Djoumessi, has paved way for companies to sign contracts for the execution of priority road maintenance works.

The priority road maintenance works linking Ikoti-Mokango-Mofako-Ikenge 6 Bera-Bkoko in the Ndian division of the Southwest region, was awarded to WILLEX TRAIDING and Construction Company Limited. The maintenance works was to cover a length of 20km and the progress of work is globally estimated at 100%, with a consumption rate of 98.01%. This project was financed by the Road Funds with an estimated amount of FCFA 177 732 014 million VAT.

Another contract for the maintenance works on the priority road Lot.16 linking Iribanyange-Kumba-Balue-Pondo-Bakumba-Dosoni, Kombone Mission-Boa-Bobewde, Kombone Mission-Pombele in Meme division of the Southwest region, was awarded to ATEMCO Company under a contract No. 045/M/MINTP/CMPM-ERPR/2015, to carry out a periodic road maintenance works covering a total stretch of 23km.  According to the terms of this contract an amount of FCFA 74,491,500 million (VAT), was estimated for the project sponsored by Road Funds. Meanwhile, the technical control was handed over to BEC LA ROUTIERE, as of now the physical advancement is 100% gone.

In the same line, according to the report gathered, the head of control mission revealed that, the periodic road maintenance works has attain its maximum satisfaction as far as this project is concern and the follow-up team gave it a positive remakes, in this vein the works is completed and temporarily handed over to the project owner.

Regarding an increasing nature of road maintenance linking farm-to-market roads, it is an indication that coating shoulders will be transformed paving ways for an increasing level for agriculture within the country.

Plus de contenus dans Actualités

Route Nationale N°21: Ekong-Bengbis, les travaux de la phase 1 ont démarré.

Posté le : févr. 24, 2023, Par : alima - Dans : Actualités

La construction de la route Ekong-Bengbis dans la région du Sud, a démarré avec les travaux de la phase 1, qui sâ€...

Reconstruction de la route Mora-Dabanga-Kousseri: l’entreprise démarre les travaux sur la première section

Posté le : avril 1, 2024, Par : BEYOKOL - Dans : Actualités

Le démarrage des travaux de reconstruction de la route Mora-Dabanga-Kousseri a débuté avec les travaux sur la prem...

Traitement d’un point d'affaissement de la chaussée à Efok sur la N4: l'entreprise Razel s’est mobilisée

Posté le : avril 17, 2023, Par : BEYOKOL - Dans : Actualités

Après la descente effectuée sur le site par le Ministre des Travaux publics, le lundi 10 avril 2023, l’entreprise...

Route Bertoua-Batouri, les travaux sont achevés sur la section Mandjou-Akokan.

Posté le : mars 2, 2022, Par : alima - Dans : Actualités

Longue de 45 km, le lot 1 Mandjou-Akokan de la route Bertoua-Batouri affiche à ce jour un  taux d'avancement physiq...
Suivez-nous sur les réseaux sociaux - FaceBook Twitter RSS