Français English
Vous êtes ici : Projets/Réalisations » Actualités

Actualités

North-west: Maintenance of some major roads in the western network

Posté le : oct. 31, 2014, Par : Hannah - Dans : Actualités

Transformation in high gear, this project is no longer a dream but a reality that has taken shape and is impacting on the economy of the area.

The road which is within the framework of a joint Cameroon-Nigeria project, code named, Nkambe-Berabe-Ako (D74), Ako-Abongsie border to Nigeria (7D4), Misaje border with Nigeria (D105) and Kakar-towards Adamawa Region (P26). The multinational road and transport facilitation programme seeks to maintain the 153 km road from Cameroon to Nigeria borders which will boost relationships and socio-economic ties between the two countries.

The physical work done on the site is about 80%, as indicated by the engineers executing and controlling the project. According to the engineers of ETS SAWI Company, in charge of the execution of the project and CERBAT the company carrying out control, the first phase of the 153 km maintenance road project is progressing and preparatory works are ongoing on the second and third phase. The contract was awarded under No 135/M/MINTP/CPM-ERRP/2010. The road maintenance project that is at least 153km long has been split into four lots;

-         Lot 1;       Nkambe-Berabe-Ako (D74)

-         Lot 2;       Ako-Abongsie border to Nigeria (7D4)

-         Lot 3;       Misaje border with Nigeria (D105) and,

-         Lot 4;       Kakar-towards Adamawa Region/NW (P26)

The maintenance work is contracting for specific items of maintenance work, such as the resealing, overlay or reconstruction of a specific length of pavement are widely used and there is considerable experience. However, particularly for road maintenance works, there is often a need for contracts to cover a wider scope of work. Routine and periodic maintenance operations are sometimes contracted separately. Walls of the loose soils surrounding the road are being reinforced with concrete.

Plus de contenus dans Actualités

Route Yaoundé-Douala : Le MINTP évalue les travaux et prescrit de nouvelles directives

Posté le : oct. 25, 2016, Par : admin - Dans : Actualités

Le Ministre des Travaux publics s’est rendu à Matomb le dimanche 23 Octobre 2016 au lendemain du rétab...

Pont en structure métallique sur la rivière Mayo Taram: l’entreprise programme la construction des pieux.

Posté le : mars 28, 2024, Par : BEYOKOL - Dans : Actualités

Avec la fin de l'installation de l'entreprise et l'approvisionnement du chantier en matériaux et agrégats, la suite...

Etat des routes dans la région du Nord-Ouest : les députés veulent savoir l’Etat d’avancement.

Posté le : juil. 16, 2020, Par : alima - Dans : Actualités

Une délégation de 18 députés de la région du Nord-Ouest conduite par l’Honorable Njingum Musa, Questeur à l...

Construction de la route Mandjou-Akokan, à un pas de la fin des travaux

Posté le : mars 22, 2022, Par : alima - Dans : Actualités

Les travaux de construction de la route Mandjou - Akokan dans la région de l’Est sont quasiment achevés, avec un ...