New officials at the Ministry of Public Works
Posté le : déc. 20, 2013, Par : mesp23 - Dans : en-Actualités
Four senior officials of the Ministry of Public Works were promoted by a Presidential decree of Thursday 28 November 2013.
They include two Director Generals and two Inspector Generals, closest collaborators of the Minister for Public Works.

Their mission is to implement the new organization chart of
MINTP which since 13 September 2013 is responsible for the construction and
maintenance of road, motorway, seaport, airport, railway, energy and
environmental infrastructures of the country.
These pioneers are :
- Mr. Tchoumi Jean Lambert, Director General of Infrastructure Works ;
- Mr. Abouna Zoa Guy, Director General of Technical Studies ;
- Mr. Ekwa Dipanda Charles Bertrand, Inspector General
in charge of Services ;
- Mr. Efoua Fono René, Inspector General in charge of Technical issues.
If three of them are of the Ministry, Mr. Abouna Zoa Guy is from the Ministry of the Economy, Planning and Regional Development where he occupied the post of Director of Infrastructures and Support to Local and
Regional Development. Being a Civil Engineer, one can say that he is of the building sector even if he is not or was not of the ministry of Public Works.
From an indiscrete source, we gathered that he is the one who conducted the feasibility studies of the 2nd Wouri bridge and of the Yaounde-Douala motorway.
Out of the three others, only Mr. Ekwa Dipanda Charles conserves his post. A graduate of ENAM, Treasury Inspector, he was appointed at MINTP in 2006 as Inspector No2 in charge of Services after working at the
Treasury Department and as Inspector Verificator at the Bafoussam General Treasury.
The other two have been promoted : prior to his appointment, Mr. Tchoumi Jean Lambert, Engineer of the Ecole Polytechnique, was Director of Rural Roads. It is said that he is so intelligent and brilliant
that he has always been the first of his batch.
Mr. Efoua Fono René, Civil Engineer, was the Littoral Regional Delegate of Public Works in Douala. He was the key man of preparations for the ceremony of the laying of the foundation stone for the construction of the Wouri
second bridge. He illustrated himself with the construction of one of the scale models of the said bridge with young Cameroonian engineers using recovery
equipment.
Plus de contenus dans en-Actualités
EVALUATION OF THE ROAD MAP OF THE MINISTRY OF PUBLIC WORKS AS OF 30 NOVEMBER 2013 : MANY LATENESS RECORDED.
Posté le : déc. 20, 2013, Par : mesp23 - Dans : en-Actualités
The Secretary General of the Ministry of Public Works, Mr. Zo’o Zame Philémon presided over the m...
THE BRAZZAVILLE-YAOUNDE CORRIDOR NEAR COMPLETION
Posté le : janv. 29, 2021, Par : admin - Dans : en-Actualités
The partial acceptance of the Mintom-Lele stretch of road took place last January 26, 2021.
Annual Conference of the Central and deconcentrated Services of MINTP. Efficiency in the construction, rehabilitation and maintenance of infrastructures in the menu
Posté le : janv. 26, 2017, Par : Eliane - Dans : en-Actualités
Management based on Results, execution within...
262.591 billion CFA F is the budget of the Ministry of Public Works for the 2014 Financial Year
Posté le : déc. 20, 2013, Par : mesp23 - Dans : en-Actualités
It was adopted on Monday 2 December 2013 at 4.20 a.m by the Finance and Budget Committee of the Nati...
Interview
Posté le : avril 29, 2013, Par : Hannah - Dans : en-Actualités