Français English
Vous êtes ici : Documentation » Normes techniques et cadre réglementaire

Normes techniques et cadre réglementaire

Installation of Gantries on the Mora-Dabanga-Kousseri Road

Posté le : nov. 28, 2022, Par : alima - Dans : Actualités

The installation of gantries on National No.1, Mora-Dabanga-Kousseri section, has recorded progress as one has been erected at KP 4+500 between Mora and Kousseri. It should be mentioned that so far, it takes up to 6 days to install a gantry. Two prefabricated gantries are fit for installation, the third one is being assembled at the workshop.

The Minister of Public Works has decided to install these devices, including rain gates, as a result of non-compliance of road users with the regulation governing load limits; they rather abusively overload, as observed on this section of National Road No 1. This conduct impedes works which have been going on for several months now, and has led to the advanced degradation of the pavement.

Plus de contenus dans Actualités

Bikoula-Djoum : le MINTP prescrit une redynamisation plus accrue de l'entreprise.

Posté le : avril 29, 2020, Par : alima - Dans : Actualités

Faisant suite à la télé réunion organisée il y a une semaine par le Ministre des Travaux publics, Emmanuel NG...

Immeuble siège MINTP, le Ministre recommande l’accélération de la production de l’entreprise

Posté le : janv. 5, 2023, Par : alima - Dans : Actualités

Le Ministre des Travaux publics a apprécié ce jeudi, 5 janvier 2023, les avancées observées dans la construction ...

Conférence annuelle des services centraux, déconcentrés et organismes sous-tutelle du MINTP

Posté le : janv. 15, 2016, Par : Hannah - Dans : Actualités

Le Ministre des Travaux publics a présidé la cérémonie d’ouverture de la conférence annuelle des services cent...
Suivez-nous sur les réseaux sociaux - FaceBook Twitter RSS