Normes techniques et cadre réglementaire
Installation of Gantries on the Mora-Dabanga-Kousseri Road
Posté le : nov. 28, 2022, Par : alima - Dans : Actualités
The installation of gantries on National No.1, Mora-Dabanga-Kousseri section, has recorded progress as one has been erected at KP 4+500 between Mora and Kousseri. It should be mentioned that so far, it takes up to 6 days to install a gantry. Two prefabricated gantries are fit for installation, the third one is being assembled at the workshop.
The Minister of Public Works has decided to install these devices, including rain gates, as a result of non-compliance of road users with the regulation governing load limits; they rather abusively overload, as observed on this section of National Road No 1. This conduct impedes works which have been going on for several months now, and has led to the advanced degradation of the pavement.
Plus de contenus dans Actualités
Infrastructures routières : plus de 200 km de routes seront bitumés dès cette année 2023, sous financement BIP
Posté le : févr. 13, 2023, Par : BEYOKOL - Dans : Actualités
Aménagement des routes Bamenda-Batibo-Numba et Bachuo Akagbé-mamfé-Ekok, le maître d’ouvrage prend le pouls
Posté le : oct. 16, 2015, Par : Hannah - Dans : Actualités
Dans le prolongement des échanges amorcés le 12 octobre 2015, le Ministre des Trava...
PSU : plus de 268 km en réhabilitation dans la région de l’Est
Posté le : juil. 23, 2014, Par : Hannah - Dans : Actualités
La route RN10 MANDJOU-BATOURI-NGOURA (109,50 kilomètres) et NGOURA-KENTZOU II-Y...
Lutte contre la corruption dans la chaîne de réalisation des travaux publics : sensibiliser, cerner pour juguler efficacement la corruption.
Posté le : nov. 9, 2021, Par : alima - Dans : Actualités