Français English
Vous êtes ici : Documentation » Normes techniques et cadre réglementaire

Normes techniques et cadre réglementaire

Installation of Gantries on the Mora-Dabanga-Kousseri Road

Posté le : nov. 28, 2022, Par : alima - Dans : Actualités

The installation of gantries on National No.1, Mora-Dabanga-Kousseri section, has recorded progress as one has been erected at KP 4+500 between Mora and Kousseri. It should be mentioned that so far, it takes up to 6 days to install a gantry. Two prefabricated gantries are fit for installation, the third one is being assembled at the workshop.

The Minister of Public Works has decided to install these devices, including rain gates, as a result of non-compliance of road users with the regulation governing load limits; they rather abusively overload, as observed on this section of National Road No 1. This conduct impedes works which have been going on for several months now, and has led to the advanced degradation of the pavement.

Plus de contenus dans Actualités

Mécanisme de Gestion des Plaintes (MGP) du PACRI

Posté le : mars 28, 2024, Par : kevinkonmenek - Dans : Actualités

Le Mécanisme de Gestion des Plaintes (MGP) du PACRI se veut être un outil par lequel les parties prenantes peuve...

National Road No.16: Start of Works on the Kumba-Ekondo Titi Section

Posté le : nov. 28, 2022, Par : alima - Dans : Actualités

Following new security measures taken to enable the execution of construction works for the 60-km-long Kum...

Route Bamenda-Batibo-Numba : réception provisoire des ouvrages connexes

Posté le : juin 18, 2015, Par : admin - Dans : Actualités

Du 08 au 10 juin 2015,  la commission de réception provisoire du contrat d’éxécution des ouvrages connexes d...