Installation of Gantries on the Mora-Dabanga-Kousseri Road
Posté le : nov. 28, 2022, Par : alima - Dans : Actualités
The installation of gantries on National No.1, Mora-Dabanga-Kousseri section, has recorded progress as one has been erected at KP 4+500 between Mora and Kousseri. It should be mentioned that so far, it takes up to 6 days to install a gantry. Two prefabricated gantries are fit for installation, the third one is being assembled at the workshop.
The Minister of Public Works has decided to install these devices, including rain gates, as a result of non-compliance of road users with the regulation governing load limits; they rather abusively overload, as observed on this section of National Road No 1. This conduct impedes works which have been going on for several months now, and has led to the advanced degradation of the pavement.
Plus de contenus dans Actualités
Second pont sur le Wouri. Les travaux sont en cours, en attendant la libération totale des emprises
Posté le : sept. 7, 2016, Par : admin - Dans : Actualités
L’avancement du projet de construction du second Pont sur le Wouri et ses accès fait état de ce qu’a...
Route Olama – Bingambo (N22). L’entreprise est mobilisée sur le terrain
Posté le : mai 3, 2019, Par : Eliane - Dans : Actualités
Les travaux de construction de la section Ola...
Conférence semestrielle des services centraux et déconcentrés: la grand-messe a été ouverte par le Ministre des Travaux publics
Posté le : janv. 24, 2023, Par : alima - Dans : Actualités
Route Yoko-Lena. Les travaux sont achevés sur cette section de la Nationale N°15
Posté le : oct. 10, 2019, Par : ngono - Dans : Actualités
En attendant la réception des travaux, c’e...
THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités