Installation of Gantries on the Mora-Dabanga-Kousseri Road
Posté le : nov. 28, 2022, Par : alima - Dans : Actualités
The installation of gantries on National No.1, Mora-Dabanga-Kousseri section, has recorded progress as one has been erected at KP 4+500 between Mora and Kousseri. It should be mentioned that so far, it takes up to 6 days to install a gantry. Two prefabricated gantries are fit for installation, the third one is being assembled at the workshop.
The Minister of Public Works has decided to install these devices, including rain gates, as a result of non-compliance of road users with the regulation governing load limits; they rather abusively overload, as observed on this section of National Road No 1. This conduct impedes works which have been going on for several months now, and has led to the advanced degradation of the pavement.
Plus de contenus dans Actualités
SECOND PONT SUR LE WOURI: UNE ILLUSTRATION DE LA DENSE COOPERATION ENTRE LE CAMEROUN ET LA FRANCE/SECOND BRIDGE ON THE WOURI: AN ILLUSTRATION OF A CONCRETE COOPERATION BETWEEN CAMEROON AND FRANCE.
Posté le : oct. 31, 2019, Par : ngono - Dans : Actualités
The beauty of this impressive architectural w...
Projets d’entretien routier dans la région du Centre, le Secrétaire d’Etat dans les services du gouverneur
Posté le : juin 2, 2022, Par : alima - Dans : Actualités
Revue des grands chantiers routiers. Les entrées Est et Ouest de la ville de Douala à l’ordre du jour
Posté le : août 4, 2016, Par : Hannah - Dans : Actualités
Le Ministre des Travaux Publics, Emmanuel NGANOU DJOUMESSI, a entamé le merc...
Axe Mundemba-Isangele-Akwa. Une équipe du MINTP effectue des travaux pour le rétablissement de la circulation
Posté le : nov. 23, 2016, Par : admin - Dans : Actualités
Development of the road Kumba-Mamfe: the effectiveness of work will soon begin
Posté le : oct. 21, 2014, Par : Hannah - Dans : Actualités
The Minister of Public Works has promise to do its best to enable the Internation...