Français English
Vous êtes ici : Projets/Réalisations » Actualités

Actualités

Installation of Gantries on the Mora-Dabanga-Kousseri Road

Posté le : nov. 28, 2022, Par : alima - Dans : Actualités

The installation of gantries on National No.1, Mora-Dabanga-Kousseri section, has recorded progress as one has been erected at KP 4+500 between Mora and Kousseri. It should be mentioned that so far, it takes up to 6 days to install a gantry. Two prefabricated gantries are fit for installation, the third one is being assembled at the workshop.

The Minister of Public Works has decided to install these devices, including rain gates, as a result of non-compliance of road users with the regulation governing load limits; they rather abusively overload, as observed on this section of National Road No 1. This conduct impedes works which have been going on for several months now, and has led to the advanced degradation of the pavement.

Plus de contenus dans Actualités

COMMUNICATION GOUVERNEMENTALE : Emmanuel NGANOU DJOUMESSI FACE A LA PRESSE

Posté le : août 23, 2018, Par : Innocent Kadji - Dans : Actualités

Le Ministre des Travaux Publics a donné un important point de presse, le  jeudi 23 août 2018. C’étai...

Nationale 17A: 74 km bitumés sous fonds propres pour relier Mengong à Sangmelima

Posté le : déc. 22, 2022, Par : Innocent Kadji - Dans : Actualités

Le Ministre des Travaux Publics,Emmanuel NGANOU DJOUMESSI, a procédé ce 22 décembre 2022, à la mise en service de...