Recherche
THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Les cadres de la Délégation Régionale des Travaux publics du Sud s’approprient des textes législatifs et réglementaires dans le secteur des BTP
Posté le : juin 13, 2014, Par : admin - Dans : Actualités
L’inspecteur Général des Services du Ministère des Travaux Publics, représentant de Monsieur le Ministre, a...
Route Yaoundé-Bafoussam-Bamenda. Les travaux à exécuter sur l’itinéraire Pont d’Ebebda-Carrefour Ndikinimeki- Bandjoun préoccupent
Posté le : janv. 5, 2016, Par : Hannah - Dans : Actualités
Soucieux de l’évolution des travaux d’entretien sur certains tronço...
Route Nationale N°21: Ekong-Bengbis, les travaux de la phase 1 ont démarré.
Posté le : févr. 24, 2023, Par : alima - Dans : Actualités
Rivière Ngoum à Kekem: priorité à l'achèvement du pont en structure métallique Acrow
Posté le : mars 28, 2023, Par : BEYOKOL - Dans : Actualités