Vous êtes ici : Recherche
Recherche
THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This road structure located on the National Road N°4 at the junction with National Road N° 1, was inaugurated this November 10, 2022 by the Minister of Public Works, Emmanuel Nganou Djoumessi, in the presence of the Minister of Transport, Jean Ernest Massena Ngalle Bibehe, the Director General of the African Development Bank Group for the Central Africa Region, Serges N'guessan and the Secretary of State in the Ministry of Public Works in charge of Roads, Armand Ndjodom. The symbolic ribbon was cut and the commemorative plaque unveiled in front of a jubilant crowd.
Financed by the African Development Bank within the framework of the Support Program for the Transport Sector, phase II, this interchange aims at an efficient management of traffic from the two National Roads N°1 (Yaoundé-Batchenga-Bouam) and N°4 (Yaoundé-Bafoussam), the reduction of transport costs and transit time on the corridor which connects the capital of Cameroon to the eastern border of Nigeria via the West and North-west regions whose economy is essentially based on agriculture and trade, and on eliminating accident-prone dark spots on the said stretch of road.
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Construction de la Nationale 15 : l’entreprise se concentre sur la couche de roulement et l’ouvrage sur la rivière Méloko sur la section Ntui-Ndjolé.
Posté le : mars 28, 2024, Par : BEYOKOL - Dans : Actualités
Au 23 mars 2024, il y a lieu de relever que sur cette section de 60 km reliant Ntui à Ndjolé sur la Nationale 15, ...
National road No.1: MINTP partially receives works on Nkolessong-Nding 89km and 6km bypass road at Nanga-Eboko-Bifogo
Posté le : juin 9, 2022, Par : alima - Dans : Actualités
This afternoon, the Ministry of Public Works did a partial reception of the construction of bypass road such as...
Session extraordinaire du conseil d'administration du MATGENIE: les nouveaux responsables installés
Posté le : déc. 28, 2023, Par : BEYOKOL - Dans : Actualités
Le Ministre des Travaux Publics , Emmanuel NGANOU DJOUMESSI, a présidé ce mardi 26 décembre 2023, une session extr...
Le manuel de procédures et directives pour l’entretien routier disponible
Posté le : févr. 22, 2016, Par : admin - Dans : Actualités
Le 13 novembre 2016, se tenait à l’Ecole Nationale des Travaux Publics (ENSTP) la réunion de coordination des s...
Route Nationale N°1: les travaux en cours sur la section Mbéré-Ngaoundéré progressent
Posté le : sept. 20, 2016, Par : Hannah - Dans : Actualités
Les travaux repris récemment sur la section Mbéré-Ngaoundéré de la r...