Recherche
THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Infrastructures routières: les acteurs en synergie pour un suivi rigoureux des projets
Posté le : janv. 26, 2024, Par : BEYOKOL - Dans : Actualités
Projets d’infrastructures : Les acteurs en conclave pour une synergie d’action
Posté le : juin 27, 2014, Par : Hannah - Dans : Actualités
Weighing stations to curb overloaded trucks in Cameroon
Posté le : juin 27, 2014, Par : Hannah - Dans : Actualités
The Ministry of Public Works places significant emphasis on the management of ove...
Construction des infrastructures portuaire, aéroportuaire, ferroviaire et énergétique : le MINTP s’approprie sa mission.
Posté le : juin 25, 2014, Par : Hannah - Dans : Actualités
Le rôle du MINTP ne se limite plus à la supervision et au contrôle technique d...
Route Kumba-Mamfé : bientôt la fin du calvaire.
Posté le : févr. 18, 2014, Par : mesp23 - Dans : Actualités
Le Ministre des Travaux Publics vient de p...