THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Douala-Bonepoupa: les travaux d’urgence effectifs entre les PK 14 et 21
Posté le : nov. 21, 2023, Par : BEYOKOL - Dans : Actualités
Station de pesage routier fixe de Mekong : la nouvelle équipe prend service
Posté le : juin 9, 2022, Par : alima - Dans : Actualités
Pont sur la rivière Mmem à Olorunti. L’état d’avancement des travaux se situe à 40%
Posté le : sept. 13, 2016, Par : Hannah - Dans : Actualités
Les travaux de construction du Pont sur la rivière Mmem à Olorunti sur le t...
Autoroute Yaoundé-Douala, phase 1: le MINTP apprécie l’évolution des travaux sur les voies de raccordement
Posté le : nov. 10, 2023, Par : BEYOKOL - Dans : Actualités
1er mai 2014 : Le MINTP fête en évitant le VIH/SIDA
Posté le : mai 2, 2014, Par : Hannah - Dans : Actualités
Ce jeudi 01er mai 2014 comme les années précédentes, le personnel du ...