THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Construction de la route Olama- Kribi : avancement satisfaisant du lot 1 Olama-Bingambo
Posté le : oct. 26, 2020, Par : alima - Dans : Actualités
Travaux complémentaires de l’accès Est de la ville de Douala. On entrevoit déjà la fin des prestations
Posté le : oct. 17, 2016, Par : Hannah - Dans : Actualités
L’avancement actuel des travaux complémentaires de l’entrée Est de ...
Pont de la Mape-Carrefour Mwoumbam (24km): les travaux sont exécutés à 19,5%
Posté le : janv. 5, 2024, Par : Hannah - Dans : Actualités
Route Nkolessong-Nding et bretelle Nanga Eboko-Bifogo, l’entreprise reprend les travaux
Posté le : janv. 27, 2017, Par : Eliane - Dans : Actualités
Après de longs mo...
Politique sectorielle des transports au Cameroun. Des Réformes en vue d’un mode de transport multimodal
Posté le : mars 23, 2017, Par : Eliane - Dans : Actualités
Le Ministre Délégué auprès du Ministre ...