THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
MINTP evaluates projects in South West Region
Posté le : sept. 26, 2023, Par : BEYOKOL - Dans : Actualités
Exécution du budget MINTP: une performance de 80,6% enregistrée au 30 septembre 2022
Posté le : nov. 9, 2022, Par : alima - Dans : Actualités
AXE NUMBA-BACHUO AKAGBE: LES TRAVAUX ATTEIGNENT LES 100% DE REALISATION
Posté le : sept. 19, 2014, Par : Hannah - Dans : Actualités
Les travaux d’aménagement de la route Numba-Bachuo akagbe son...
Entrée Ouest de Douala : « les travaux ne doivent pas s’arrêter »
Posté le : janv. 28, 2016, Par : Hannah - Dans : Actualités
C’est la prescription faite par le Ministre des Travaux publics, ...
Développement rural. Le 11ème FED prévoit un appui à l’aménagement des routes
Posté le : avril 21, 2016, Par : Hannah - Dans : Actualités
Une séance de travail a réuni le jeudi 21 avril 2016 dans la salle des réu...