THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Construction de 14 postes de péage automatique: les travaux sont exécutés à 40% sur 7 sites
Posté le : mars 15, 2023, Par : alima - Dans : Actualités
Celebration of the 31st Edition of the International Women’s Day: Health at first!
Posté le : mars 4, 2016, Par : Hannah - Dans : Actualités
The event in MINTP was characterized with lots of activities, to start with; the ...
Entrée Ouest de Douala : « les travaux ne doivent pas s’arrêter »
Posté le : janv. 28, 2016, Par : Hannah - Dans : Actualités
C’est la prescription faite par le Ministre des Travaux publics, ...
Entrée Est de la ville de Douala: l’entreprise MAG accélère la cadence des travaux routiers
Posté le : nov. 20, 2023, Par : BEYOKOL - Dans : Actualités
Travaux d’aménagement de l’accès Est de la ville de Douala : Les solutions qui viennent du PGES
Posté le : mars 24, 2015, Par : Hannah - Dans : Actualités
Le comité de Suivi de la mise en œuvre du Plan de Gestion Environnementale et Socia...