THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
1er mai 2014 : Le MINTP fête en évitant le VIH/SIDA
Posté le : mai 2, 2014, Par : Hannah - Dans : Actualités
Ce jeudi 01er mai 2014 comme les années précédentes, le personnel du ...
Un guide de l’usager et un manuel de procédures de gestion des ressources humaines au Mintp
Posté le : mars 17, 2014, Par : Hannah - Dans : Actualités
Le séminaire atelier tenu du lundi 10 au vendredi 14 mars 2014 à l’...
Travaux en régie : la Brigade dédiée du MINTP sur la route Mbalmayo-Sangmelima.
Posté le : juin 8, 2020, Par : alima - Dans : Actualités
Route Kumba Ekondo Titi : les Travaux de terrassement réalisés couvrent actuellement un linéaire de 55 km
Posté le : mai 16, 2023, Par : BEYOKOL - Dans : Actualités
Pénétrante Est de la ville de Douala : bientôt la reprise des travaux.
Posté le : oct. 11, 2021, Par : alima - Dans : Actualités