THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Nationale 5: des travaux d’entretien sur la section Pont du Nkam-Bandjoun (73 Km
Posté le : nov. 21, 2023, Par : BEYOKOL - Dans : Actualités
Le Fonds routier et le Labogenie reçoivent la visite du Mintp et du SETAT
Posté le : nov. 16, 2015, Par : Hannah - Dans : Actualités
Entamée le lundi 09 novembre 2015, la visite des institutions placées sous la t...
Route Nkolessong-nding : en attente du bitume pour la livraison de ce lot.
Posté le : août 21, 2020, Par : alima - Dans : Actualités
Une mission de la comptabilité matière dans les services centraux du MINTP
Posté le : août 12, 2014, Par : Hannah - Dans : Actualités
Depuis le 22 mai 2014, une délégation de responsables de la direction de la Normali...
Rencontres fraternelles du Sud: le MINTP présente le réseau routier de la région.
Posté le : oct. 16, 2021, Par : alima - Dans : Actualités