THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Travaux en régie sur la N5, 80 dégradations traitées au 4 mai 2023
Posté le : mai 5, 2023, Par : alima - Dans : Actualités
Les équipes de la Brigade nationale des Travaux en régie et des services déconcentrés compétents du Minist...
Coopération Cameroun-BAD: faire plus, mieux et dans les délais
Posté le : juil. 6, 2021, Par : alima - Dans : Actualités
Coopération BAD-Cameroun. L’administrateur du Groupe Afrique centrale de la Banque africaine de Développement reçu par le MINTP
Posté le : nov. 25, 2015, Par : Hannah - Dans : Actualités
Le Ministre des Travaux publics, Emmanuel NGANOU DJOUMESSI a accordé le mard...
Le MINTP prépare la 5ème édition de la journée nationale de la protection du patrimoine routier
Posté le : sept. 23, 2014, Par : Hannah - Dans : Actualités
Au mois de novembre prochain, l’on célébrera au Cameroun la Journée nationale ...