THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This road structure located on the National Road N°4 at the junction with National Road N° 1, was inaugurated this November 10, 2022 by the Minister of Public Works, Emmanuel Nganou Djoumessi, in the presence of the Minister of Transport, Jean Ernest Massena Ngalle Bibehe, the Director General of the African Development Bank Group for the Central Africa Region, Serges N'guessan and the Secretary of State in the Ministry of Public Works in charge of Roads, Armand Ndjodom. The symbolic ribbon was cut and the commemorative plaque unveiled in front of a jubilant crowd.
Financed by the African Development Bank within the framework of the Support Program for the Transport Sector, phase II, this interchange aims at an efficient management of traffic from the two National Roads N°1 (Yaoundé-Batchenga-Bouam) and N°4 (Yaoundé-Bafoussam), the reduction of transport costs and transit time on the corridor which connects the capital of Cameroon to the eastern border of Nigeria via the West and North-west regions whose economy is essentially based on agriculture and trade, and on eliminating accident-prone dark spots on the said stretch of road.
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Traversée du fleuve Mbam à Nchiayang dans le Mbam et Inoubou, le Bac mis en service
Posté le : avril 6, 2022, Par : alima - Dans : Actualités
Une équipe de la Délégation régionale des Travaux publics pour le Centre s’est rendue hier, mardi 05 avril 2022...
Route Djoum- Mintom : Les travaux routiers et les aménagements connexes provisoirement réceptionnés
Posté le : mars 1, 2017, Par : Eliane - Dans : Actualités
Le Secrétaire général du Ministère des Tr...
Travaux Publics: Les nouveaux responsables prennent fonction.
Posté le : mars 11, 2021, Par : alima - Dans : Actualités
Ils ont été installés dans leurs nouvelles fonctions ce jeudi 11 mars 2021, toute suite au lendemain de leur nomin...
Infrastructures durables dans la région de l’Extrême-nord, le MINTP propose des solutions pour réduire les impacts des inondations sur les routes et ouvrages
Posté le : avril 6, 2023, Par : BEYOKOL - Dans : Actualités
Adopter des mesures de renforcement de la résilience des routes et ouvrages, atténuer l’effet des changements cli...
Remplacement des buses par des Dalots sur la Nationale 3 Yaoundé Douala Phase 2: il faut accélérer les travaux sur le lot 1 Yaoundé-Pont de la Ndoupé.
Posté le : nov. 5, 2021, Par : alima - Dans : Actualités
Le taux d'exécution des travaux affiche 45 % pour des délais de consommation de 69%. Sur les 10 dalots proj...