THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Aménagement de l’entrée Est de la ville de Douala : Les travaux exécutés à 91,09 %
Posté le : mars 29, 2016, Par : Hannah - Dans : Actualités
Les travaux entamés il y a plusieurs mois à l’entrée Est de la capitale ...
Autoroute Yaoundé-Douala. L’entreprise concentre ses efforts sur la section 40-60
Posté le : mai 23, 2019, Par : ngono - Dans : Actualités
Les travaux de construction de la phase I de ...
Route Ekondo Titi-Kumba, un nouveau dispositif pour la réalisation des travaux
Posté le : juil. 4, 2022, Par : alima - Dans : Actualités
Autoroute Yaoundé-Douala (phase 1). Les travaux de déforestage se prolongent au-delà du PK 42
Posté le : sept. 19, 2016, Par : ngono - Dans : Actualités
Si les travaux de terrassement se sont po...