THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
Priorités du secteur Infrastructure routière pour les trois prochaines années: la BAD et le Cameroun scrutent les perspectives
Posté le : déc. 5, 2022, Par : Hannah - Dans : Actualités
Route Mora-Dabanga-Kousseri. Priorité au maintien de la circulation et à la sécurisation des travaux.
Posté le : août 6, 2020, Par : alima - Dans : Actualités
Exécution des travaux de cantonnage. Le MINTP monte d’un cran dans le transfert des compétences
Posté le : févr. 20, 2017, Par : admin - Dans : Actualités
C’est dans le but d’accélérer le processus de transfert des compétences aux collectivités territor...
Autoroute Yaoundé-Douala, phase I. Le compte à rebours a commencé pour la livraison de l’infrastructure.
Posté le : mai 6, 2021, Par : alima - Dans : Actualités
Entrée Est de la ville de Douala: l’entreprise MAG accélère la cadence des travaux routiers
Posté le : nov. 20, 2023, Par : BEYOKOL - Dans : Actualités