THE OBALA TRUMPET INTERCHANGE HAS BEEN OPENED TO TRAFFIC
Posté le : nov. 10, 2022, Par : alima - Dans : Actualités
This project was completed within 24 months, and mainly comprises 3.5 km of paved roads constituting the service roads; a four-span bridge with a total span of 51.4 linear meters; 5897 square meters of embankment protected by masonry; a rest area for heavy duty vehicles with a capacity of 68 parking lots. During the commissioning, the Minister of Public Works and the Minister of Transport signed the documents transferring the rest area to the Ministry of Transport.
“Each kilometer of paved road, each linear meter of road built in our country, marks one more step towards our emergence. This shows that we are working to materialize the political will of a man, that of the President of the Republic, His Excellency Paul Biya. I am happy to note that this structure has been completed and put into service,” said Minister Emmanuel Nganou Djoumessi before visiting the roads developed in the city of Obala as part of this project.
Plus de contenus dans Actualités
HIMO : LES TRAVAUX S’ACCELERENT
Posté le : févr. 14, 2014, Par : Hannah - Dans : Actualités
Akonolinga, le 13 février 2014. La ville a accueilli une délégation conjointe ...
Convention d’assistance Technique MINTP-MATGENIE : le pointsur la mobilisation des engins dans les chantiers.
Posté le : mai 30, 2014, Par : Hannah - Dans : Actualités
Le 28 mai 2014, l’Hôtel Mont Fébé de Yaoundé a servi de cadre à la cérémon...
Railway capacity and expansion issues: the need for the modest railways in Cameroon
Posté le : sept. 3, 2014, Par : Hannah - Dans : Actualités
Convention signed between the Republic of Cameroon and Cam Iron S.A known as the ...
Route Babadjou-Bamenda, 21% des travaux réalisés sur la section Babadjou-Matazem
Posté le : nov. 14, 2022, Par : alima - Dans : Actualités
Malgré quelques contraintes liées à la pluviométrie et à la pénurie de gasoil, l’entreprise Bun...