Maintenance of rural roads to exceed expectation in SW
Posté le : août 31, 2016, Par : ngono - Dans : Actualités
The launching of National Tender by the Minister of Public Works, Emmanuel Nganou Djoumessi, has paved way for companies to sign contracts for the execution of priority road maintenance works.
The priority road maintenance works linking Ikoti-Mokango-Mofako-Ikenge 6 Bera-Bkoko in the Ndian division of the Southwest region, was awarded to WILLEX TRAIDING and Construction Company Limited. The maintenance works was to cover a length of 20km and the progress of work is globally estimated at 100%, with a consumption rate of 98.01%. This project was financed by the Road Funds with an estimated amount of FCFA 177Â 732Â 014 million VAT.
Another contract for the maintenance works on the priority road Lot.16 linking Iribanyange-Kumba-Balue-Pondo-Bakumba-Dosoni, Kombone Mission-Boa-Bobewde, Kombone Mission-Pombele in Meme division of the Southwest region, was awarded to ATEMCO Company under a contract No. 045/M/MINTP/CMPM-ERPR/2015, to carry out a periodic road maintenance works covering a total stretch of 23km. Â According to the terms of this contract an amount of FCFA 74,491,500 million (VAT), was estimated for the project sponsored by Road Funds. Meanwhile, the technical control was handed over to BEC LA ROUTIERE, as of now the physical advancement is 100% gone.
In the same line, according to the report gathered, the head of control mission revealed that, the periodic road maintenance works has attain its maximum satisfaction as far as this project is concern and the follow-up team gave it a positive remakes, in this vein the works is completed and temporarily handed over to the project owner.
Regarding an increasing nature of road maintenance linking farm-to-market roads, it is an indication that coating shoulders will be transformed paving ways for an increasing level for agriculture within the country.
Plus de contenus dans Actualités
Bitumage de la route Bandja-Fondjomekwet dans le Haut-Nkam: le MINTP prescrit un planning d’achèvement des travaux de Kekem à Bayong
Posté le : févr. 15, 2024, Par : BEYOKOL - Dans : Actualités
Entretien des routes en terre : la note de stratégie vulgarisée.
Posté le : juin 4, 2021, Par : alima - Dans : Actualités
Etat du réseau routier dans la région du Sud : 53,92% des routes bitumées en bon état
Posté le : sept. 6, 2016, Par : admin - Dans : Actualités
Selon les derniers indicateurs, l’état du réseau routier dans la région du Sud se présente actuell...
Travaux d’entretien de la Route Nationale N°3. Le Ministre des Travaux publics sur le site
Posté le : août 8, 2016, Par : admin - Dans : Actualités
Le Ministre des Travaux publics, Emmanuel Nganou Djoumessi a parcouru l’itinéraire Yaoundé-Pont de Ndo...
Phase 2 de l’autoroute Yaoundé-Douala. On prépare le lancement de l’appel public international à manifestation d’intérêt pour la sélection des entreprises
Posté le : mars 3, 2016, Par : Hannah - Dans : Actualités
C’est dans l’optique d’assurer le prolongement de l’autoroute YaoundÃ...